The brief

For forty years the sidings were fenced off: a strip of scrub between the town centre and the river that most residents had never walked through. Halden Council bought the land in 2021 with a simple ambition: open it up, and make it somewhere people want to be.

We spent the first six months listening. Walks with schools, an open studio in an empty shop, and conversations on the towpath told us people wanted three things: to reach the water, to feel safe after dark, and to keep the wildness that had grown up on the site.

The design

The park steps down to the river in five broad terraces, built from the railway ballast and spoil already on site. Each terrace is a different habitat, from mown lawn at the top to wet meadow at the water's edge.

We kept every tree that could be kept. The oldest birch on the site is now the centre of the play area.

Lighting follows the main path only, leaving the lower meadow dark for bats. A new bridge connects the park to the estates on the far bank for the first time.

Film

Opening day, in three minutes.

Film by Northlight Studio. Captions available.

Gallery

Results

One year on.

Visits in year one
410k
Counted at the four entrances.
Biodiversity net gain
38%
Against a target of 20%.
Trees retained
212
Plus 640 new trees planted.
Local volunteers
85
In the Friends of Millbrook group.

Fieldwork listened longer than anyone we have worked with. The park works because the people who use it helped design it.

Amara OkaforHead of Parks, Halden Council